Foundations
and Steelwork |
|
Foundations
and Steelwork |
|
The external
stonework of the terrace which will be back-filled,
raising the groundfloor level of the house |
|
The floor of the
house is raised above the level of the terrace and
the drainpipes set in place in the floor. |
|
the floor of the
house is raised above the level of the terrace and
the drainpipes set in place in the floor. |
|
The swimming
pool will adjoin the terrace at the same level at
the 'seaward' end of the house. |
|
The outer walls
are lined inside with bricks and insulation |
|
The village of
Pyrgos on the skyline |
|
Now the ceiling/upstairs
floor must be laid with extensive steel reinforcement
and the pipes for the upstairs plumbing. |
|
Now the ceiling/upstairs
floor must be laid with extensive steel reinforcement
and the pipes for the upstairs plumbing. |
|
The ceiling in
place with insulation panels under the terrace section |
|
The construction
of the upper floor accommodation and the walls of the
terrace can now continue. |
|
The construction
of the upper floor accommodation and the walls of the
terrace can now continue. |
|
The construction
of the upper floor accommodation and the walls of the
terrace can now continue. |
|
The first floor
walls completed. |
|
The outside staircase
to the upper terrace. |
|
View from the upper
terrace |
|
The shuttering
for the pool. |
|
Extensive steel
reinforcements for the pool |
|
Close-up view of
the steel reinforcements |
|
Close-up
view of the steel reinforcements |
|
The pipework is
carefully laid out within the metalwork. |
|
The bell tower
of Pyrgos church clearly visible on the skyline. |
|
The steps up to
the terrace and pool. |
|
The door gives
access to the pool pumps, filters etc. |
|
The master bedroom
roof now in place. |
|
The house from
outside the perimiter wall. |
|
The house from
the slopes below Pyrgos. |
|
The northern sides of the annex
and the house |
|
Pyrgos on the horizon on a glorious
day |
|
The pool ready for decent glass
mosaic |
|
The main entrance with hand-cut
cornerstones |
|
Looking out to sea on a sunny day |
|
A long view of the the Aloni House |
|
The foundations of the future concrete
slab where the 20m2 of solar collectors will be placed. |
|
Underfloor heating in the studio |
|
The studio now plastered inside |
|
Tiling the pool is well underway |
|
Tiling the pool is well underway |
|
The tiles, made from re-cycled
glass, have still to grouted with a special swimming-pool
mixture. |
|
The pool edges are a special stone
from Egypt - fit for a pharaoh! |
|
The over-all effect will be stunning |
|
View from behind the studio |
|
View from the side of the house |
|
As always - a glorious view from
the terrace |
|
As always - a glorious view from
the terrace |
|
The landscape is a luxuriant green
in spring while the see sparkles below in the sunshine |
Previous
Page
|